ForemanFOREMAN
Requests & RFI Tracking

Send Requests and track every response

RFIs, Bid Requests, Change Orders — any structured question you send to an architect, GC, or subcontractor. Add multiple recipients, require a response from each, and track every answer on the project record. Nothing gets lost in email.

RFI-003Responded
Peak Electric
Mar 19
Electrical panel location
RE
Peak Electric
Can you confirm the panel location? The plans show two possible spots on page 4. Need to know before we start rough-in tomorrow.
You
You
Panel goes in the utility closet — NE corner. Confirm with your inspector before rough-in starts.
Resolved · Mar 19 at 3:42 PM

One record type, every kind of ask

RFIs, Bid Requests, Change Orders, Lien Waivers — they all live under Requests. Add multiple recipients, decide who must respond, and send from the same builder.

Reference the exact spot on the plan

Attach a plan with an annotation marking exactly where the question applies. Each recipient sees the plan, the annotation, and their questions together.

Every question and answer on record

Requests and their responses are stored permanently on the project. Months later, you can look up exactly what was decided, who said it, and when.

Request Builder

Create any Request in 30 seconds

Choose the kind — RFI, Bid Request, Change Order, or whatever fits — write your questions, add recipients, and decide who needs to respond. Hit Send and each recipient gets their own unique link, no login required.

REQ-0005 · RFI
Question
Confirm header height at east wall
Description
Drawing shows 9'0" but spec sheet says 8'6". Which governs?
Recipients
J. Torres (Architect)
M. Chen (GC)
📎Attach plan reference
Plan References

Point to the exact spot on the drawing

Attach a plan to a Request and mark the exact location with an annotation. Every recipient sees the plan, the markup, and the questions together — no ambiguity, no back-and-forth to clarify context.

East wall header
REQ-0005
Response Tracking

Track every Request from sent to closed

See which Requests are open, which have been viewed, and which have responses — per recipient. Every answer is timestamped and attached to the project record. RFIs, Bid Requests, and all other kinds live in one list.

Requests4 records · 2 open
REQ-0001RFI·Responded
Header flashing detail
Apr 3
REQ-0002RFI·Responded
Beam pocket dimensions
Apr 7
REQ-0003Bid Request·Viewed
Framing subcontractor bids
Apr 10
REQ-0004RFI·Sent
Header height east wall
Apr 12

How it works

Three steps. That's it.

1

Create the Request

Pick the kind — RFI, Bid Request, Change Order, or other — write your questions, and optionally attach a plan with an annotation showing exactly where the question applies.

2

Add recipients and choose who must respond

Add one or more architects, GCs, or subcontractors. Toggle "Response required" per recipient — those who need to answer get a response form; others see a read-only view.

3

Every answer goes on the record

When a recipient responds, their answers are stored on the Request and attached to the project permanently. You're notified immediately, and all responses are visible in one place.

Frequently asked questions

Ready to run your projects from bid to built?